Project Overview
The West and North segments of the North Shore Aqueduct of the Central Utah Water Conservancy District Water Development Project (CWP) will provide approximately 53,000 acre-feet of drinking water to communities located in northern Utah and southern Salt Lake counties including but not limited to Saratoga Springs, Eagle Mountain, Lehi, as well as the Jordan Valley Water Conservancy District.
The water sources are the Utah Valley Water Treatment Plant (UVWTP) located at the mouth of Provo Canyon and groundwater wells in the Vineyard area.
West Pipeline
The 60-inch diameter West segment of the pipeline begins with a connection to the existing Pioneer Crossing pipeline near Redwood Road and 600 North (Pioneer Crossing Boulevard) in Saratoga Springs. This portion of the pipeline will run west to 800 West and then north along 800 West, across SR-73, to approximately 1600 North (W. Military Road). It will then turn west and run to approximately 1200 West to the site of the future North Shore Terminal Reservoir.
The West segment also includes a 48-inch diameter pipeline that starts at approximately 800 West and 600 North and runs south along 800 West to Pony Express Parkway. It will end at a flow control turnout structure for Saratoga Springs and Eagle Mountain.
North Pipeline
The 48-inch diameter North segment of the pipeline begins at the future North Shore Terminal Reservoir site and will run parallel to the West segment pipe along W. Military Road (1600 N) to 800 West. It then runs east-northeasterly to Redwood Road. It then crosses Redwood Road and runs northeasterly, following the Utah Lake Distribution Canal to approximately 2370 North. It will end in a water turnout vault for Saratoga Springs, Lehi, and Jordan Valley Water Conservancy District. |
 |